Steel Manufacturer
How a SAR 200M Saudi steel manufacturer raised productivity 40%, cut costs 25% and grew revenue 14% within 90 days by fixing its operating system.
12/28/20251 min read


The Problem
Unplanned downtime consuming a large share of production capacity, with margins eroding year after year.
What Broke
Equipment failures causing 3-5 day emergency shutdowns.
Unplanned downtime eating 14% of production time.
Production parameters unchanged for 5+ years despite supplier/material changes.
Quality defects at 4.8%.
The Fix
Predictive maintenance (IoT + AI), real-time production optimization, computer vision
Within 90 Days
40% productivity increase using the same equipment
25% reduction in costs
14% revenue increase