Steel Manufacturer

How a SAR 200M Saudi steel manufacturer raised productivity 40%, cut costs 25% and grew revenue 14% within 90 days by fixing its operating system.

12/28/20251 min read

black textile on white textile
The Problem

Unplanned downtime consuming a large share of production capacity, with margins eroding year after year.

What Broke
  • Equipment failures causing 3-5 day emergency shutdowns.

  • Unplanned downtime eating 14% of production time.

  • Production parameters unchanged for 5+ years despite supplier/material changes.

  • Quality defects at 4.8%.

The Fix

Predictive maintenance (IoT + AI), real-time production optimization, computer vision

Within 90 Days
  • 40% productivity increase using the same equipment

  • 25% reduction in costs

  • 14% revenue increase

© 2026 All Right Reserved. Designed and Marketed by Dynamic Augments.

esc-logo
esc-logo
location
location
call
call
working-hours
working-hours

King Abdulaziz Road, Riyadh

+966 057 057 8445

Sunday - Thursday | 09:00 - 18:00

Connect with us: